Army Based Performance Management
Group Effort
Fort Dix had basic models and information in place to support its performance management and measurement initiatives but was interested in improving their capabilities. This 18 page Power Point is a case study of the Resource Management Office (RMO) initiative document a methodology and procedure for building more advanced models that could be used for other directorates
Army-Based Performance Measurement